乐鱼体育证券交易委员会,华盛顿特区20549

形式公布

目前的报告

根据1934年证券交易法第13或15(d)条

     
报告日期(最早报告事件的日期):   二零零九年一月三十日

峭壁自然资源公司 . __________________________________________ ( 注册人的确切名称作为其宪章中指定)

     
俄亥俄州 1 - 8944 34 - 1464672
_____________________
(州或其他司法管辖区
_____________
(委员会
______________
(国税局雇主
合并) 文件数量) 识别号)
      
俄亥俄州乐鱼体育,苏必利尔大道1100号,15楼   44114 - 2544
_________________________________
(主要行政办事处地址)
  ___________
(邮政编码)
     
注册人的电话号码,包括地区号码:   216-694-5700

不适用 ______________________________________________ 前名或前地址,如果改变了自去年报告

 

如果8-K表格的提交是为了同时满足注册人在以下任何规定下的提交义务,请勾选以下适当的方框:

[]根据《证券法》(17 CFR 230.425)第425条进行的书面沟通
[]根据《交易法》(17 CFR 240.14a-12)第14a-12条征求材料
[]根据《交易法》第14d-2(b)条(17 CFR 240.14d-2(b)条)进行的开工前通信
[]根据《交易法》第13e-4(c)条(17 CFR 240.13e-4(c)条)进行的开工前通信


表格顶部

项目8.01其他事项。

Cliffs Natural Resources published a news release dated January 30, 2009 as follows:

Cliffs Natural Resources Inc. Announces Temporary
Production Halt At Its West Virginia Coal Operations

CLEVELAND — Jan. 30, 2009 — Cliffs Natural Resources Inc. (NYSE: CLF) announced that its wholly owned subsidiary, Pinnacle Mining Company, LLC ("Pinnacle"), will temporarily halt production at its Pinnacle Mine Complex. Plans call for the production shutdown, which will affect approximately 360 employees, to begin Monday, Feb. 2, and run through Feb. 28. Cliffs indicated the 2009 production plan at the Pinnacle Complex called for the mines to produce approximately 85,000 tons in February. Mine management met Friday afternoon with local leadership of the United Mine Workers of America to notify them of the production curtailment.

The Pinnacle Complex, which is located near Pineville, WV, includes the Pinnacle and Green Ridge # 1 and Green Ridge # 2 mines and the Pinnacle Preparation Plant. The Pinnacle and Green Ridge #1 mines both will halt production during February, while the prep plant will operate on a reduced schedule to serve customer requirements. The Green Ridge # 2 mine was previously idled.

Pinnacle produces metallurgical coal for the steel industry. Metallurgical coal demand has been reduced as the steel industry has cut back production in the face of the global economic slowdown.

"The month-long production curtailment at Pinnacle is necessary to balance our production and inventory with customer demand," said Duke Vetor, senior vice president, Cliffs North American Coal.

To be added to Cliffs Natural Resources’ e-mail distribution list, please click on the link below:
http://www.cpg-llc.com/clearsite/clf/emailoptin.html


ABOUT CLIFFS NATURAL RESOURCES INC.
Cliffs Natural Resources Inc., headquartered in Cleveland, is an international mining company, the largest producer of iron ore pellets in North America and a major supplier of metallurgical coal to the global steelmaking industry. The Company operates six iron ore mines in Michigan, Minnesota and Eastern Canada, and owns three coking coal mines in West Virginia and Alabama. Cliffs is also wholly owns Portman Limited, a large iron ore mining company in Australia, serving the Asian iron ore markets with direct-shipping fines and lump ore. In addition, the Company has a 30% interest in the Amapá Project, a Brazilian iron ore project, and a 45% economic interest in the Sonoma Project, an Australian coking and thermal coal project.

News releases and other information on the Company are available on the Internet at:
http://www.cliffsnaturalresources.com or
www.cliffsnaturalresources.com/Investors/Pages/default.aspx?b=1041&1=1

This news release contains predictive statements that are intended to be made as "forward-looking" within the safe harbor protections of the Private Securities Litigation Reform Act of 1995. Although the Company believes that its forward-looking statements are based on reasonable assumptions, such statements are subject to risk and uncertainties.

Actual results may differ materially from such statements for a variety of reasons, including: the length and extent of any potential production curtailments; changes in the sales volumes or mix; the impact of other price-adjustment factors on the Company's sales contracts; changes in demand for iron ore pellets by North American integrated steel producers, or changes in Asian iron ore demand due to changes in steel utilization rates, operational factors, electric furnace production or imports into the United States and Canada of semi-finished steel or pig iron; the impact of consolidation and rationalization in the steel industry; availability of capital equipment and component parts; availability of float capacity; changes in the financial condition of the Company's partners and/or customers; rejection of major contracts and/or venture agreements by customers and/or participants under provisions of the U.S. Bankruptcy Code or similar statutes in other countries; events or circumstances that could impair or adversely impact the viability of a mine and the carrying value of associated assets; inability to achieve expected production levels; reductions in current resource estimates; failure to receive or maintain required environmental permits; problems with productivity, labor disputes, weather conditions, fluctuations in ore grade, tons mined, changes in cost factors including energy costs, transportation, mine closure obligations and employee benefit costs; the ability to identify, acquire and integrate strategic acquisition candidates and the effect of these various risks on the Company's future cash flows, debt levels, liquidity and financial position.

Reference is also made to the detailed explanation of the many factors and risks that may cause such predictive statements to turn out differently, set forth in the Company's Annual Report and Reports on Form 10-K and previous news releases filed with the Securities and Exchange Commission, which are publicly available on Cliffs Natural Resources' website. The information contained in this document speaks as of the date of this news release and may be superseded by subsequent events.

SOURCE: Cliffs Natural Resources Inc.

INVESTOR AND FINANCIAL MEDIA CONTACT:

Steve Baisden
Director, Investor Relations and Corporate Communications
(216) 694-5280
steve.baisden@cliffsnr.com

West Virginia Media Contact:
Jim Kosowski
District Manager, Public Affairs
(216) 334-6366






表格顶部

签名

根据1934年《证券交易法》的要求,注册人已正式授权以下签字人代表其签署本报告。

         
    乐鱼体育官网斯自然资源公司
          
2009年2月2日   由:   小乔治·w·霍克
       
        姓名:小乔治·w·霍克
        职务:总法律顾问兼秘书